黄河下游引黄渠首拦沙潜堰应用研究
Application Research on the Submerged Weir of Sediment at Canal Head Diverting Water from the Lower Reaches of the Yellow River
-
摘要: 采用活动插板式或叠架式拦沙潜堰并把拦沙浴堰放置在距闸门150m左右处,可基本解决黄河下游引黄渠首拦沙潜堰应用中存在的主要问题,并可获得较好的防沙效果。Abstract: Mobile sliding-timber or stoplog submerged weir of sediment is used and put on the place about 50m form the gate. Using this method can basically solve the main problem existing in the application of the submerged weir of sediment at the canal head diverting water from he lower reaches of the Yellow River and get better prevention effects of sediment.