小浪底工程孔板泄洪洞的消能影响因素研究
A Study on Factors Affecting Energy Dissipation of Orifice Tunnels of Xiaolangdi Project
-
摘要: 小浪底工程,由导流洞改建成孔板消能泄洪洞,新洞型的采用,解决了泄洪洞的高水头、高流速,含沙量大的复杂技术问题。文章简要叙述孔板消能泄洪洞的消能情况及影响消能效果的几个主要因素。Abstract: Xiaolangdi Project rebuilds the conversion of diversion tunnels into the orifice tunnels for energy dissipation, which resolves the complex technical problems of high heads and velocities resulted from the conversion. This article introduces energy dissipation conditions of orifice tunnels and several main factors which affect energy dissipation.