南水北调安阳河倒虹吸行洪口门宽度试验研究

    Research on the Experiment of Flood-crest Travel Width for Inverted Siphon Culvert in Anyang River of the Project of Diverting the Water from the South to the North

    • 摘要: 在河道上修建倒虹吸交叉工程,行洪口门宽度是影响建筑物投资和安全的决定性因素。结合安阳河倒虹吸现场条件,对不同布设方案的行洪口门宽度进行了河工模型试验,通过分析水位、流速、主流及冲淤情况等方面试验结果,从安全性、对河势影响及工程投资等方面考虑,选定165m口门是一个合理可行的方案。

       

      Abstract: The width of flood-crest travel for inverted siphon culvert is decisive factor for the project cost and safety to construct the inverted siphon culver cross project on the watercourse.With the present condition of inverted siphon culvert of Anyang river,this paper analyzes model experimental results of water level,velocity,main current and scouring-deposition in different width under different layout schemes.From the safety,the effect of the river regime and project cost,this paper finds out that the 165 m is reasonable and feasible for flood-crest travel in width.

       

    /