金银台航电枢纽闸门启闭机主梁施工支架设计

    On Gate Hoist Girder Construction Stent Design of Jinyintai Navigation and Hydropower Project

    • 摘要: 在金银台航电枢纽启闭机排架主梁施工时,施工荷载重达130多t,在闸墩顶的钢桁架上架设高达20多m的钢管扣件式满堂红脚手架,计算该支架的稳定性、刚度及强度,并对设计方案进行了校核。

       

      Abstract: During the construction of Jinyintai Navigation and Hydropower Project hoist bent girder,the construction load is more than 130 tons,so the 20-meter-high fastener style scaffold on the pier roof steel truss is erected.The stability,stiffness and strength are calculated and the design scheme is checked.

       

    /