郑州航空港老丈八沟桥桩基工程拆除方案研究
Research on Laozhangba Bridge Pile Foundation Project Demolition Scheme of Zhengzhou Air Harbour
-
摘要: 对于郑州航空港老丈八沟桥桩基工程拆除,选择了全套筒拔桩法、冲击破桩法和钢护筒明挖法3种不同的方案,对各方案的工期和造价进行比较,优选了钢护筒明挖法,对钢护筒结构进行了设计,对施工工序进行了合理性分析。Abstract: For the Laobazhangba bridge pile foundation project demolition of Zhengzhou air harbour, it chooses three different schemes, construction period and cost to compare with.It also optimizes the steel pile simple excavation method, designs the steel pile structure and analyzes the rationality of construction procedure.