沥青混凝土心墙土石坝水力劈裂计算分析

    Calculation and Analysis on Hydraulic Fracturing of Asphalt Concrete Core-wall Earth-rock fill Dam

    • 摘要: 分析了土石坝水力劈裂原理,针对新疆吐鲁番二塘沟沥青混凝土心墙土石坝,选取河床部位最大断面为典型断面,采用有限元法对其进行水力劈裂计算分析,得出:该土石坝心墙任一高程处的中主应力都小于竖向应力,且中主应力和竖向应力都大于水压力。因此,该坝的心墙不会发生水力劈裂。

       

      Abstract: This paper analyzes the principle of earth-rockfill dam hydraulic fracturing,selects the biggest section in river area for typical sections and conducts the calculation and analysis of hydraulic fracturing by using the finite element method for Xinjiang turpan ertanggou asphalt concrete core-wall earth-rockfill dam.It comes to the conclusion that the intermediate principal stress of any elevation in core-wall earthrockfill dam is less than the vertical stress,and the intermediate principal stress and vertical stress is greater than the water pressure.So,the core-wall hydraulic fracturing of the dam is not going to happen.

       

    /