水利工程投资估算影响因素的模糊综合评价

    FCE(Fuzzy Comprehensive Evaluation) of Water Conservancy Project Investment Estimation Influence Factor

    • 摘要: 采用模糊综合评价方法分析了建设的水利工程项目成为“钓鱼工程”的原因。从评价对象因素集构建、评价合集构建、模糊关系矩阵确定、评价因素权重向量确定、综合评价结果向量合成等方面分析了模糊综合评价模型的建立步骤,并结合杨柳湖水库工程,探讨了模型的具体应用路径。

       

      Abstract: FCE is introduced to test whether the water conservancy project is belong to "fishing engineering"or not.From the evaluation object factor set establishment, evaluation compilation establishment, fuzzy relation matrix confirmation,evaluation factor weight vector confirmation and comprehensive evaluation result vector, it analyzes the FCE establishment steps.According to the Yangliu River reservoir project, it discusses the detailed application of the model.

       

    /

    返回文章
    返回