卫宗超. 渐进式评价在“双高”建设中的应用研究[J]. 黄河水利职业技术学院学报, 2020, 32(4): 64-68. DOI: 10.13681/j.cnki.cn41-1282/tv.2020.04.014
    引用本文: 卫宗超. 渐进式评价在“双高”建设中的应用研究[J]. 黄河水利职业技术学院学报, 2020, 32(4): 64-68. DOI: 10.13681/j.cnki.cn41-1282/tv.2020.04.014
    Wei Zongchao. Research on Application of Progressive Evaluation in “Double High-quality” Construction[J]. Journal of Yellow River Conservancy Technical Institute, 2020, 32(4): 64-68. DOI: 10.13681/j.cnki.cn41-1282/tv.2020.04.014
    Citation: Wei Zongchao. Research on Application of Progressive Evaluation in “Double High-quality” Construction[J]. Journal of Yellow River Conservancy Technical Institute, 2020, 32(4): 64-68. DOI: 10.13681/j.cnki.cn41-1282/tv.2020.04.014

    渐进式评价在“双高”建设中的应用研究

    Research on Application of Progressive Evaluation in “Double High-quality” Construction

    • 摘要: 中国特色高水平高职学校和专业建设计划,是新时代中国高职教育发展的重要规划。 实施“双高计划”,旨在深入贯彻习近平总书记关于职业教育的重要指示批示精神,落实《国家职业教育改革实施方案》,加快建设现代职业教育体系,推进教育改革,补齐人才短板,推动职业教育高质量发展。渐进式评价方法,是在传统评价方法基础上优化出的分段式、循序渐进的评价方法。渐进式评价方法与结果式评价方法相比,具有动态评价建设状态、渐进式修正建设目标、分段评估建设过程、递进式预测建设效果等优势。 将渐进式评价方法应用于“双高”建设的状态评价,具有必要性、可行性、前瞻性、科学性和合理性。

       

      Abstract: The plan for the construction of high-level vocational colleges and specialties with Chinese characteristics is an important plan for the development of higher vocational education in China in the new era. The implementation of “Double High-quality Plan” aims to fully implement the guiding principles of General Secretary Xi Jinping’s important instructions on vocational education, implement the Implementation Plan of the National Vocational Education Reform, accelerate the construction of modern vocational education system, promote education reform, strengthen the weak links of talent, and promote the highquality development of vocational education. The progressive evaluation method is a piecewise and progressive evaluation method optimized on the basis of the traditional evaluation method. Compared with the result evaluation method, the progressive evaluation method has many advantages, such as dynamic evaluation of construction status, progressive revision of construction targets, segmental evaluation of construction process and progressive prediction of construction effect. It is necessary, feasible, forward-looking, scientific and rational to apply the progressive evaluation method to the state evaluation of “Double High-quality” construction.

       

    /

    返回文章
    返回