武宣县高达水库枢纽工程土石方平衡分析

    Analysis on Soil and Rock Balance of Gaoda Reservoir Junction Project in Wuxuan County

    • 摘要: 土石方平衡是生产建设项目的重要环节,关系到料场及弃渣场的选择,直接影响工程投资。以广西武宣县高达水库枢纽工程为例,分析了土石方挖填量的计算、临时堆土场的规划、料场选择和弃渣的综合利用等内容,并对各方案进行了评价。评价结果显示,该工程的土石方调配方案以及水土流失防治措施在保证工程顺利建设的前提下,还具有良好的经济效益和生态效益。

       

      Abstract: The balance of soil and rock is an important link in production and construction projects, which is related to the selection of the material yard and slag disposal yard, and directly affects the project investment. Taking Gaoda reservoir junction project in Wuxuan county of Guangxi province as an example, the calculation of excavation and filling amount, the planning of temporary mound yard, the selection of yard material and the comprehensive utilization of waste slag are analyzed, and each scheme is evaluated. The evaluation results show that the soil and rock allocation scheme and control of water and soil erosion of the project have good economic and ecological benefits under the premise of ensuring the smooth construction of the project.

       

    /

    返回文章
    返回