JIAO Ai-ping, WANG Hui-ying. Reinforcement of the Levee and Treatments for Main Dangerous Situations[J]. Journal of Yellow River Conservancy Technical Institute, 2000, 12(4): 22-23. DOI: 10.13681/j.cnki.cn41-1282/tv.2000.04.010
Citation:
JIAO Ai-ping, WANG Hui-ying. Reinforcement of the Levee and Treatments for Main Dangerous Situations[J]. Journal of Yellow River Conservancy Technical Institute, 2000, 12(4): 22-23. DOI: 10.13681/j.cnki.cn41-1282/tv.2000.04.010
JIAO Ai-ping, WANG Hui-ying. Reinforcement of the Levee and Treatments for Main Dangerous Situations[J]. Journal of Yellow River Conservancy Technical Institute, 2000, 12(4): 22-23. DOI: 10.13681/j.cnki.cn41-1282/tv.2000.04.010
Citation:
JIAO Ai-ping, WANG Hui-ying. Reinforcement of the Levee and Treatments for Main Dangerous Situations[J]. Journal of Yellow River Conservancy Technical Institute, 2000, 12(4): 22-23. DOI: 10.13681/j.cnki.cn41-1282/tv.2000.04.010
Reinforcement of the Levee and Treatments for Main Dangerous Situations
This paper deals with the importance of the levee in the flood control project,and the necessity of the levee reinforcement,puts forward the reinforcing measures,at the same time,discusses treatments for the dangerous situations during the flood period.