ZHANG Dong-sheng, ZHANG Hong-xian, LI Li-gang. Technical Renovation in the Seepage Prevention and Foundation Treatment in the Main Dam Construction of Xiaolangdi Multipurpose Dam Project[J]. Journal of Yellow River Conservancy Technical Institute, 2003, 15(1): 7-9. DOI: 10.13681/j.cnki.cn41-1282/tv.2003.01.003
    Citation: ZHANG Dong-sheng, ZHANG Hong-xian, LI Li-gang. Technical Renovation in the Seepage Prevention and Foundation Treatment in the Main Dam Construction of Xiaolangdi Multipurpose Dam Project[J]. Journal of Yellow River Conservancy Technical Institute, 2003, 15(1): 7-9. DOI: 10.13681/j.cnki.cn41-1282/tv.2003.01.003

    Technical Renovation in the Seepage Prevention and Foundation Treatment in the Main Dam Construction of Xiaolangdi Multipurpose Dam Project

    • The geological conditions of the Main Dam of Xiaolangdi Multipurpose Dam Project are very complicated,hence the seepage prevention and foundation treatment works are very difficult to handle.The construction units adopted new techniques,new methods,new workmanships and advanced complete large construction equipment. They overcame the constriction technical problems,shortened the direct duration for the construction and meanwhile,they created the new construction record in China,and provided some useful references for the similar works.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return