TAN Gu-chang. Application of Incremental Dynamic Planning to Xiaolangdi Reservoir Optimized Operation[J]. Journal of Yellow River Conservancy Technical Institute, 2004, 16(1): 4-7. DOI: 10.13681/j.cnki.cn41-1282/tv.2004.01.002
Citation:
TAN Gu-chang. Application of Incremental Dynamic Planning to Xiaolangdi Reservoir Optimized Operation[J]. Journal of Yellow River Conservancy Technical Institute, 2004, 16(1): 4-7. DOI: 10.13681/j.cnki.cn41-1282/tv.2004.01.002
TAN Gu-chang. Application of Incremental Dynamic Planning to Xiaolangdi Reservoir Optimized Operation[J]. Journal of Yellow River Conservancy Technical Institute, 2004, 16(1): 4-7. DOI: 10.13681/j.cnki.cn41-1282/tv.2004.01.002
Citation:
TAN Gu-chang. Application of Incremental Dynamic Planning to Xiaolangdi Reservoir Optimized Operation[J]. Journal of Yellow River Conservancy Technical Institute, 2004, 16(1): 4-7. DOI: 10.13681/j.cnki.cn41-1282/tv.2004.01.002
Application of Incremental Dynamic Planning to Xiaolangdi Reservoir Optimized Operation
On the basis of optimization theory, by using the principles of in cr emental dynamic planning, we studied and set up an optimized operation model for Xiaolangdi multipurpose dam project, and obtained satisfactory results from the computation.