    Period Optimization Scheme Determination of Building Engineering Construction Network Plan

    • Based on the period optimization basic principal and the total time difference features of network plan job,in order to get to supply technique route to the best scheme amd according to the engineering quality target,investment control target and resource supply,the key route and the vice-key route are compared to design all feasible period optimization schemes.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return