XIAO Di-kang, YU Bing-yang. On Gate Hoist Girder Construction Stent Design of Jinyintai Navigation and Hydropower Project[J]. Journal of Yellow River Conservancy Technical Institute, 2009, 21(3): 4-7. DOI: 10.13681/j.cnki.cn41-1282/tv.2009.03.011
    Citation: XIAO Di-kang, YU Bing-yang. On Gate Hoist Girder Construction Stent Design of Jinyintai Navigation and Hydropower Project[J]. Journal of Yellow River Conservancy Technical Institute, 2009, 21(3): 4-7. DOI: 10.13681/j.cnki.cn41-1282/tv.2009.03.011

    On Gate Hoist Girder Construction Stent Design of Jinyintai Navigation and Hydropower Project

    • During the construction of Jinyintai Navigation and Hydropower Project hoist bent girder,the construction load is more than 130 tons,so the 20-meter-high fastener style scaffold on the pier roof steel truss is erected.The stability,stiffness and strength are calculated and the design scheme is checked.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return