LIANG Shu-ying, FENG Zhi-xian. Design of South-to-North Water Diversion Middle Line Tianjin Section Slow Sluice Gate Hoist[J]. Journal of Yellow River Conservancy Technical Institute, 2010, 22(1): 10-12. DOI: 10.13681/j.cnki.cn41-1282/tv.2010.01.015
    Citation: LIANG Shu-ying, FENG Zhi-xian. Design of South-to-North Water Diversion Middle Line Tianjin Section Slow Sluice Gate Hoist[J]. Journal of Yellow River Conservancy Technical Institute, 2010, 22(1): 10-12. DOI: 10.13681/j.cnki.cn41-1282/tv.2010.01.015

    Design of South-to-North Water Diversion Middle Line Tianjin Section Slow Sluice Gate Hoist

    • To meet the requirement of using special slow sluice gate hoist whose hoist speed is not more than 0.1m/min of Tianjin section main line of South-to-North water diversion middle line 1st phrase project, this paper analyzes the slow hoist layout plan and researches the plan and designs the structure of motors, transmissions and brakes.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return