CHENG Kexiong, TAN Jianbo. Research on Optimization Design of Baima Mountain Reservoir Concrete Stone-laying Arch Dam of Guizhou Province[J]. Journal of Yellow River Conservancy Technical Institute, 2014, 26(3): 1-3. DOI: 10.13681/j.cnki.cn41-1282/tv.2014.03.002
    Citation: CHENG Kexiong, TAN Jianbo. Research on Optimization Design of Baima Mountain Reservoir Concrete Stone-laying Arch Dam of Guizhou Province[J]. Journal of Yellow River Conservancy Technical Institute, 2014, 26(3): 1-3. DOI: 10.13681/j.cnki.cn41-1282/tv.2014.03.002

    Research on Optimization Design of Baima Mountain Reservoir Concrete Stone-laying Arch Dam of Guizhou Province

    • Baima mountain reservoir dam of Guizhou province is a single concrete gravity arch dam with a maximum height of 48 meters, which built by laying stones rubble by masonry technique.This article analyzes the dam body structure, stress deformation and dam abutment stability by adopting analogy method and combining ADAO arch dam analysis and optimization software, it adjusts the design scheme of dam body to satisfy the requirement of SL25-2006 and SL282-2003 technical specification.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return