On Flood and Tide Control Demonstration of Reclamation Planning Scheme in The Pearl River Estuary
-
Graphical Abstract
-
Abstract
It builds one and two dimensional tidal current mathematical model,calculates the influence of reclamation planning scheme on surrounding waters in the Pearl River estuary through selecting six groups of flood in recent years,and analyzes the bad influence of planning scheme on hengmen and its south branch flood discharge and puts forward the prevention and remedial measures.
-
-