HOU Yun-feng, WANG Wei. Sichuan Qingnan Road Dacheng Railway Variable Height Swivel Bridge Construction Scheme Optim ization Research[J]. Journal of Yellow River Conservancy Technical Institute, 2017, 29(1): 20-22. DOI: 10.13681/j.cnki.cn41-1282/tv.2017.01.006
    Citation: HOU Yun-feng, WANG Wei. Sichuan Qingnan Road Dacheng Railway Variable Height Swivel Bridge Construction Scheme Optim ization Research[J]. Journal of Yellow River Conservancy Technical Institute, 2017, 29(1): 20-22. DOI: 10.13681/j.cnki.cn41-1282/tv.2017.01.006

    Sichuan Qingnan Road Dacheng Railway Variable Height Swivel Bridge Construction Scheme Optim ization Research

    • There are some problems of Sichuan Qingnan Road Dacheng Railway variable height swivel bridge original design scheme,such as project delay,quality control.Aiming to the particularity and construction feature of construction,it uses overall pouring twice prestress tension optimization scheme.It analyzes optimization scheme prestress construction procedure,control keypoint,and discusses the stand setup scheme comparison and selection,overall pouring attention matters,steel cable prestress and quality control methods and so on.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return