Temporary Consolidation Design and Check and Calculation of Number 0 Block of Continuous Beam Bridge
-
-
Abstract
IIn the construction process of continuous beam bridge, in order to prevent the overturning of the main beam, the pier and beam consolidation should be carried out at block 0. Taking a continuous beam bridge with a span of (72+128+72) m as an example, the temporary consolidation scheme of pier and beam is designed, and the anti-overturning stability is checked and calculated, and the structural requirements of the temporary anchorage structure system are analyzed.
-
-