Li Wei. Analysis on Climbing Frame Construction in Xingxue Road Plot of Panyu District in Guangzhou[J]. Journal of Yellow River Conservancy Technical Institute, 2022, 34(1): 51-54. DOI: 10.13681/j.cnki.cn41-1282/tv.2022.01.012
    Citation: Li Wei. Analysis on Climbing Frame Construction in Xingxue Road Plot of Panyu District in Guangzhou[J]. Journal of Yellow River Conservancy Technical Institute, 2022, 34(1): 51-54. DOI: 10.13681/j.cnki.cn41-1282/tv.2022.01.012

    Analysis on Climbing Frame Construction in Xingxue Road Plot of Panyu District in Guangzhou

    • Climbing frame construction is the core of high-rise building construction, and its quality has a great impact on the construction progress, quality and safety of the whole project. Aiming at Xingxue Road plot of Panyu district, it analyzes the key points of construction such as the design, erection, installation and dismantling of the climbing frame, and discusses the quality control of the key parts.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return