LUO Liang, FU Lijun. Establishment of Measurement and Control Network for Steel Box Beam Installation of Anyang-Luoshan Yellow River Grand Bridge[J]. Journal of Yellow River Conservancy Technical Institute, 2023, 35(2): 20-24. DOI: 10.13681/j.cnki.cn41-1282/tv.2023.02.005
    Citation: LUO Liang, FU Lijun. Establishment of Measurement and Control Network for Steel Box Beam Installation of Anyang-Luoshan Yellow River Grand Bridge[J]. Journal of Yellow River Conservancy Technical Institute, 2023, 35(2): 20-24. DOI: 10.13681/j.cnki.cn41-1282/tv.2023.02.005

    Establishment of Measurement and Control Network for Steel Box Beam Installation of Anyang-Luoshan Yellow River Grand Bridge

    • The stable,reliable and special measurement and control network can provide the guarantee for the construction of steel box beam.It analyzes the characteristics of steel box beam construction and the difficulty of control network layout of the south sub bridge of Yellow River Bridge from Yuanyang to Zhengzhou section of Anyang-Luoshan expressway.It studies the location selection of control points,construction of observation platform and measurement methods of control network,and puts forward some schemes such as the survey and control network layout of steel box beam,construction of top beam pier and elevation measurement of opposite triangle.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return