MA Danrong. Analysis on Soil and Rock Balance of Gaoda Reservoir Junction Project in Wuxuan County[J]. Journal of Yellow River Conservancy Technical Institute, 2024, 36(1): 6-11. DOI: 10.13681/j.cnki.cn41-1282/tv.2024.01.002
    Citation: MA Danrong. Analysis on Soil and Rock Balance of Gaoda Reservoir Junction Project in Wuxuan County[J]. Journal of Yellow River Conservancy Technical Institute, 2024, 36(1): 6-11. DOI: 10.13681/j.cnki.cn41-1282/tv.2024.01.002

    Analysis on Soil and Rock Balance of Gaoda Reservoir Junction Project in Wuxuan County

    • The balance of soil and rock is an important link in production and construction projects, which is related to the selection of the material yard and slag disposal yard, and directly affects the project investment. Taking Gaoda reservoir junction project in Wuxuan county of Guangxi province as an example, the calculation of excavation and filling amount, the planning of temporary mound yard, the selection of yard material and the comprehensive utilization of waste slag are analyzed, and each scheme is evaluated. The evaluation results show that the soil and rock allocation scheme and control of water and soil erosion of the project have good economic and ecological benefits under the premise of ensuring the smooth construction of the project.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return